Sunday, April 18, 2010

Back to Moth work




A combo of spar work and dolly work to get them ready while I source the materials for the deck and order the rest of the parts. A shot of the mast base fitting finally installed and a picture of two boom fittings (vang strop and mainsheet holder), a mast fitting (shroud terminal) and a 505 boom fitting for my brother. All of them are one big step closer, after this picture was taken, and should be ready by next weekend hopefully. The dolly should be done by next weekend as well so I can shape the foredeck and get ready to lay up the deck.

No comments:

Post a Comment