Thursday, December 31, 2009

Dolly bunk creation






A few layers of scrap fiberglass laid over the bottom of the hull and on top of a layer of rug with plastic over it to act as a spacer created both of the bunks. The layup was about 3-4 layers of fiberglass, some unidirectional, followed by a piece of balsa core for structure and something to use for depth when bolting to the the dolly frame, followed by more fiberglass. Then they will be faired with bondo, primed and painted with flat black paint. I'm at the fairing and painting stage, that is, after they're dry fitted to the frame.

No comments:

Post a Comment